Air conditioner electricity cost per month
A 1.5 kW AC scheduled for eight hours daily at 55% average compressor load uses about 198 kWh in 30 days. Multiply that energy by your applicable electricity rate for the monthly cost.
Cooling schedule
One AC, three monthly scenarios.
Each scenario uses 1.5 kW electrical input. The tariff remains separate so energy and price assumptions never get confused.
Mild use
63 kWh/monthAt $0.18/kWh$11.34
Typical use
198 kWh/monthAt $0.18/kWh$35.64
Heavy use
405 kWh/monthAt $0.18/kWh$72.90
Verified market references
The same 198 kWh costs different amounts.
These are current, source-backed reference rates from the data layer. They are editable starting points—not substitutes for the tariff on an individual bill.
Enter the per-kWh energy charge from your utility bill. For time-of-use service, run separate peak and off-peak scenarios.
No current default loaded →INR · India₹1,100.885.5600/kWh · Maharashtra · MSEDCL
Effective through 2027-03-31 · Source verified →AUD · AustraliaA$65.620.3314/kWh · New South Wales · Ausgrid
Effective through 2027-06-30 · Source verified →SGD · SingaporeSGD 68.860.3478/kWh · Singapore
Effective through 2026-09-30 · Source verified →AED · United Arab EmiratesEnter local rateUse the marginal slab rate plus the current fuel surcharge shown by your electricity authority, expressed in AED per kWh. Account for VAT if it is not already included.
No current default loaded →BRL · BrazilR$156.300.7894/kWh · São Paulo · Enel SP
Effective through 2027-07-03 · Source verified →Monthly formula
Keep energy and price visible.
Monthly kWh = input kW × hours/day × days × average compressor loadThen multiply monthly kWh by the applicable unit rate. For time-of-use tariffs, calculate peak and off-peak portions separately.
Why the month changes
Cooling demand is not constant.
Weather and humidityHotter, wetter periods usually increase compressor activity.
Room and buildingSun exposure, leakage, insulation, size and occupancy change heat gain.
Set point and maintenanceLow temperatures, blocked airflow and equipment condition can increase runtime.